Risk Determination, Prioritization, and Classifying in Construction Project Case Study: Gharb Tehran Commercial-Administrative Complex
Table 1
Average matrix of interrelations of criteria.
| ā | Time | Cost | Quality |
| Time | (0.000, 0.000, 0.000) | (0.175, 0.425, 0.675) | (0.675, 0.925, 1.000) | Cost | (0.150, 0.400, 0.650) | (0.000, 0.000, 0.000) | (0.650, 0.900, 1.000) | Quality | (0.325, 0.575, 0.825) | (0.625, 0.875, 1.000) | (0.000, 0.000, 0.000) |
|
|