Research Article

Modelling to Engineering Data Using a New Class of Continuous Models

Table 4

Statistic for the relief time data.

Models(D2), D1, , ,

E(0.004), 0.44.600.9668.0, 68.7, 67.9, 68.0
KwE(0.86), 0.140.450.0742.0, 44.8, 43.3, 42.3
BrXE(0.17), 0.251.330.2448.1, 50.1, 49.0, 48.5
MOE(0.55), 0.180.800.1443.5, 45.5, 44.2, 43.9
GMOE(0.78), 0.150.510.0842.8, 45.7, 44.3, 43.3
KMOE(0.86), 0.151.080.1943.0, 46.8, 45.6, 43.6
MOKE(0.87), 0.140.600.1141.6, 45.5, 44.3, 42.3
OLE(<0.1%), 0.91.300.2249.1, 50.1, 49.3, 49.3
BE(0.80), 0.160.700.1243.5, 46.5, 44.9, 44.0
ME(0.07), 0.322.760.5354.3, 55.3, 54.5, 54.5
LBHE(<0.1%), 0.40.620.1167.7, 68.7, 67.9, 67.8
TLWE(0.952), 0.100.360.04041.35, 41.14, 41.39, 40.15