Table of Contents
Journal of Industrial Engineering
Volume 2013 (2013), Article ID 572072, 12 pages
http://dx.doi.org/10.1155/2013/572072
Research Article

Integrative Approach to the Plant Commissioning Process

1Department of Chemical and Process Engineering, University of Canterbury, Private Bag 4800, Christchurch 8020, New Zealand
2Department of Mechanical Engineering, University of Canterbury, Private Bag 4800, Christchurch 8020, New Zealand

Received 20 September 2012; Revised 2 December 2012; Accepted 19 December 2012

Academic Editor: Xueqing Zhang

Copyright © 2013 Kris Lawry and Dirk John Pons. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. R. Bernhardt, “Approaches for commissioning time reduction,” Industrial Robot, vol. 24, no. 1, pp. 62–71, 1997. View at Google Scholar · View at Scopus
  2. R. B. Brown, M. B. Rowe, H. Nguyen, and J. R. Spittler, “Time-constrained project delivery issues,” AACE International Transactions(PM. 09), pp. 1–7, 2001. View at Google Scholar
  3. P. Gikas, “Commissioning of the gigantic anaerobic sludge digesters at the wastewater treatment plant of Athens,” Environmental Technology, vol. 29, no. 2, pp. 131–139, 2008. View at Publisher · View at Google Scholar · View at Scopus
  4. D. Horsley, Ed., Process Plant Commissioning, Institution of Chemical Engineers, Rugby, UK, 2nd edition, 1998.
  5. IPENZ, Practice Note 09: Commissioning Capital Plant, IPENZ, Wellington, New Zealand, 2007.
  6. J. Kirsilä, M. Hellström, and K. Wikström, “Integration as a project management concept: a study of the commissioning process in industrial deliveries,” International Journal of Project Management, vol. 25, no. 7, pp. 714–721, 2007. View at Publisher · View at Google Scholar · View at Scopus
  7. NHS, Project Management in a PCT Environment, National Primary and Care Trust Development Programme, 2004.
  8. B. Peachey, R. Evitts, and G. Hill, “Project management for chemical engineers,” Education for Chemical Engineers, vol. 2, no. 1, pp. 14–19, 2007. View at Publisher · View at Google Scholar · View at Scopus
  9. Project Management Institute (PMI), A Guide to the Project Management Body of Knowledge (PMBOK Guide), Project Management Institute, Newtown Square, Pa, USA, 4th edition, 2008.
  10. P. V. Thomas, “Best practice for process plant modifications (fertilizer plants),” Cost Engineering, vol. 45, no. 5, pp. 19–29, 2003. View at Google Scholar · View at Scopus
  11. V. S. Sohmen, “Capital project commissioning. Factors for success,” in Proceedings of the 36th Annual Transactions of the American Association of Cost Engineers (AACE' 92), Orlando, Fla, USA, June-July 1992.
  12. H. M. Guven and S. T. Spaeth, “Commissioning process and roles of pyers,” in Proceedings of the ASHRAE Winter Meeting, la, New Orleans, La, USA, January 1994.
  13. S. K. Shome, “Integration of commissioning activities in project management in power sector,” in Proceedings of the Project Management in the Power Sector Seminar, Ooty, India, November 1982.
  14. M. G. Tribe and R. R. Johnson, “Effective capital project commissioning,” in Proceedings of the 54th IEEE Pulp and Paper Industry Technical Conference (PPIC' 08), Piscataway, NJ, USA, June 2008.
  15. E. E. Choat, “Implementing the commissioning process,” in Proceedings of the Winter Meeting of ASHRAE Transactions, Part 1, Chicago, Ill, USA, January 1993 1993.
  16. S. Doty, “Simplifying the commissioning process,” Energy Engineering, vol. 104, no. 2, pp. 25–45, 2007. View at Google Scholar · View at Scopus
  17. E. Schepers, “Commissioning chemical process plant,” in Proceedings of the 2nd National Chemical Engineering Conference, pp. 60–69, Institution of Chemical Engineers, University of Queensland, Surfers Paradise, Australia, 1974.
  18. G. Shimmings, “Reflections on the causes of delays in commissioning automated materials handling projects,” in Proceedings of the 3rd International Conference on Automated Materials Handling, Birmingham, UK, 1986.
  19. A. Levi and M. Stonell, “Project management and commissioning of industrial boiler plant,” Institution of Mechanical Engineers, Conference Publications, pp. 55–67, 1979. View at Google Scholar · View at Scopus
  20. E. Cagno, F. Caron, and M. Mancini, “Risk analysis in plant commissioning: the Multilevel Hazop,” Reliability Engineering and System Safety, vol. 77, no. 3, pp. 309–323, 2002. View at Publisher · View at Google Scholar · View at Scopus
  21. V. Ramnath, “How you can precommission process plants systematically,” Hydrocarbon Processing, vol. 90, no. 4, pp. 119–124, 2011. View at Google Scholar · View at Scopus
  22. A. Rautenbach, “Site acceptance testing and commissioning of process control systems,” Elektron, vol. 19, no. 5, pp. 40–44, 2002. View at Google Scholar · View at Scopus
  23. G. Reid, “How to achieve successful startup and commissioning for instrumentation and controls project,” in Proceedings of the Advances in Instrumentation and Control Conference, vol. 47, pp. 121–124, ISA Services, Houston, Tex, USA, October 1992 1992.
  24. ISO 31000, Risk Management—Principles and Guidelines, International Organization for Standardization, 2009.
  25. D. J. Pons, “Strategic risk management in manufacturing,” The Open Industrial and Manufacturing Engineering Journal, vol. 3, pp. 13–29, 2010. View at Google Scholar
  26. J. Leitch, “Eliminating the risks to starting up your plant right the first time,” Hydrocarbon Processing, vol. 85, no. 12, pp. 47–52, 2006. View at Google Scholar · View at Scopus
  27. FIPS, “Integration definition for function modeling (IDEF0),” 1993, http://www.itl.nist.gov/fipspubs/idef02.doc.
  28. KBSI, “IDEF0 overview,” 2000, http://www.idef.com/idef0.htm.
  29. D. J. Pons, “Ventures of co-ordinated effort,” International Journal of Project Organisation and Management, vol. 4, no. 3, pp. 231–255, 2012. View at Publisher · View at Google Scholar
  30. NZAS, “Unloader,” in Tiwai Pointer, pp. 1–7, Newsletter of New Zealand Aluminium Smelters, 2011. View at Google Scholar
  31. NZAS, “A look at our new ship unloader,” in Tiwai Pointer, pp. 1–7, Newsletter of New Zealand Aluminium Smelters, 2012. View at Google Scholar