Research Article

A Multiobjective Iterated Greedy Algorithm for Truck Scheduling in Cross-Dock Problems

Table 4

The average of epsilon indicator that was obtained in each level of parameters.

Problem set
468101212345

11.0891.1111.1201.1291.1131.1161.1131.1021.1261.107
21.0721.0671.0731.0661.0761.0881.0601.0651.0711.071
31.0831.0801.0791.0821.0761.0801.0811.0761.0781.085
41.0421.0451.0421.0501.0501.0461.0451.0401.0461.053
51.0661.0591.0601.0661.0641.0601.0661.0511.0621.077

Average1.0711.0721.0751.0791.0761.0781.0731.0671.0761.078