Research Article
Fuzzy Multiobjective Reliability Optimization Problem of Industrial Systems Using Particle Swarm Optimization
Table 1
Input data for decomposition system.
| Components | Reboiler | Falling film pressure | Absorber | Gas separator | Heat exchanger | High pressure | Low pressure | Low pressure | High pressure |
| Failure rate (hrs−1) | 4.154 × | 3.952 × | 1.592 × | 4.783 × | 2.612 × | 6.956 × | 6.264 × | Repair time (hrs) | 3.1746 | 2.6421 | 3.3323 | 4.7619 | 4.899 | 4.6831 | 6.2310 |
|
|