Research Article

A Joint Optimization Model of Production Scheduling and Maintenance Based on Data Driven for a Parallel-Series Production Line

Table 3

The related maintenance parameters.

j12345

5050586060
22222
1515202525
1000100010020002000
6060706565
0.50.50.70.60.6