A Joint Optimization Model of Production Scheduling and Maintenance Based on Data Driven for a Parallel-Series Production Line

Table 6

The difference value between the independent model and integrated model (Nā€‰=ā€‰4).

Production scheduling model and maintenance planning modelThe total cost of the integrated modeldiff
The total maintenance cost ()The total production cost ()

30700.695091.505792.195398.97393.22
35863.005091.505954.505356.03598.47
401045.575091.506137.075316.08820.47
451252.975091.506344.475291.031053.44
501475.005091.506566.505272.591293.91
551719.615091.706801.315257.501543.81
601937.965091.707019.665244.921774.74