A Joint Optimization Model of Production Scheduling and Maintenance Based on Data Driven for a Parallel-Series Production Line
Table 6
The difference value between the independent model and integrated model (Nā=ā4).
| | Production scheduling model and maintenance planning model | The total cost of the integrated model | diff | The total maintenance cost () | The total production cost () | |
| 30 | 700.69 | 5091.50 | 5792.19 | 5398.97 | 393.22 | 35 | 863.00 | 5091.50 | 5954.50 | 5356.03 | 598.47 | 40 | 1045.57 | 5091.50 | 6137.07 | 5316.08 | 820.47 | 45 | 1252.97 | 5091.50 | 6344.47 | 5291.03 | 1053.44 | 50 | 1475.00 | 5091.50 | 6566.50 | 5272.59 | 1293.91 | 55 | 1719.61 | 5091.70 | 6801.31 | 5257.50 | 1543.81 | 60 | 1937.96 | 5091.70 | 7019.66 | 5244.92 | 1774.74 |
|
|