Research Article
A Joint Optimization Model of Production Scheduling and Maintenance Based on Data Driven for a Parallel-Series Production Line
Table 7
The difference value between the independent model and integrated model
.
| N | Production scheduling model and maintenance planning model | The total cost of the integrated model | diff | The total maintenance cost () | The total production cost () | |
| 1 | 94.43 | 1292.00 | 1386.43 | 1313.28 | 73.15 | 2 | 335.58 | 2451.80 | 2787.38 | 2535.84 | 251.54 | 3 | 533.81 | 3796.40 | 4330.21 | 3946.07 | 384.14 | 4 | 700.69 | 5091.50 | 5792.19 | 5398.97 | 393.22 | 5 | 847.72 | 6268.90 | 7116.62 | 6635.97 | 480.65 | 6 | 981.81 | 7350.80 | 8332.61 | 8238.29 | 94.32 | 7 | 1105.14 | 8511.20 | 9616.34 | 9598.67 | 17.67 | 8 | 1220.43 | 9813.90 | 11034.33 | 11026.73 | 7.6 |
|
|