Research Article

A Joint Optimization Model of Production Scheduling and Maintenance Based on Data Driven for a Parallel-Series Production Line

Table 7

The difference value between the independent model and integrated model .

NProduction scheduling model and maintenance planning modelThe total cost of the integrated modeldiff
The total maintenance cost ()The total production cost ()

194.431292.001386.431313.2873.15
2335.582451.802787.382535.84251.54
3533.813796.404330.213946.07384.14
4700.695091.505792.195398.97393.22
5847.726268.907116.626635.97480.65
6981.817350.808332.618238.2994.32
71105.148511.209616.349598.6717.67
81220.439813.9011034.3311026.737.6