Research Article
A Joint Optimization Model of Production Scheduling and Maintenance Based on Data Driven for a Parallel-Series Production Line
Table 8
The difference value between the periodic maintenance model integrated and integrated model (Nā=ā4).
| | Periodic maintenance model integrated production | The total cost of the integrated model | diff |
| 30 | 5673.23 | 5398.97 | 274.26 | 35 | 5779.15 | 5356.03 | 423.12 | 40 | 5836.78 | 5316.08 | 520.7 | 45 | 6091.56 | 5291.03 | 800.53 | 50 | 6266.71 | 5272.59 | 994.12 | 55 | 6535.81 | 5257.5 | 1278.31 | 60 | 6709.6 | 5244.92 | 1464.68 |
|
|