Research Article
A Joint Optimization Model of Production Scheduling and Maintenance Based on Data Driven for a Parallel-Series Production Line
Table 9
The difference value between the periodic maintenance model integrated and integrated model (
ā=ā30).
| N | Periodic maintenance model integrated production | The total cost of the integrated model | diff |
| 1 | 1367.34 | 1313.28 | 54.06 | 2 | 2616.89 | 2535.84 | 81.05 | 3 | 4120.97 | 3946.07 | 174.9 | 4 | 5563.61 | 5398.97 | 164.64 | 5 | 6998.15 | 6635.97 | 362.18 | 6 | 8301.66 | 8238.29 | 63.37 | 7 | 9615.04 | 9598.67 | 16.37 | 8 | 11031.16 | 11026.73 | 4.43 |
|
|