Constructing a Risk Assessment Framework for Building Integrated Photovoltaic (BIPV) Projects from the Perspective of Four-Dimensional Risk
Table 6
Indicator evaluation status values under different risk dimensions.
| Indicator | Urgency | Possibility | Severity | Uncontrollability | |
| V11 | 5.3 | 2.1 | 3.5 | 8.3 | 4.240 | V12 | 6.2 | 3.6 | 8.8 | 7.7 | 6.236 | V13 | 3.8 | 5.7 | 5.4 | 6.1 | 5.168 | V21 | 6.5 | 7.9 | 8.5 | 4.4 | 6.620 | V22 | 2.4 | 8.7 | 7.3 | 4.6 | 5.146 | V23 | 4.8 | 4.5 | 7.2 | 3.6 | 4.864 | V24 | 3.2 | 2.8 | 7.6 | 3.1 | 3.812 | V25 | 5.9 | 5.8 | 5.6 | 4.2 | 5.326 | V26 | 6.3 | 8.6 | 8.5 | 5.6 | 7.126 | V31 | 6.9 | 1.8 | 7.8 | 1.5 | 3.472 | V32 | 6.5 | 2.9 | 8.2 | 2.5 | 4.434 | V33 | 2.2 | 6.8 | 2.4 | 3.8 | 3.418 | V34 | 2.7 | 6.4 | 6.9 | 3.6 | 4.552 | V41 | 6.8 | 5.3 | 3.1 | 7.6 | 5.398 | V42 | 5.6 | 6.2 | 3.8 | 6.3 | 5.369 | V43 | 6.3 | 4.5 | 7.2 | 6.6 | 6.058 | V44 | 6.7 | 6.5 | 7.5 | 3.2 | 5.686 |
|
|