Scores of different items of Imam Khomeini bus lane of Rasht.

RowItemImpactCommittee scoreRasht scoreDescription

1Fare collection management+73Bus drivers receive tickets
2Number of routes that leave out the corridor+40No route leaves out the corridor
3Frequency of bus movements at peak hours+40Is more than 2 minutes
4Frequency of bus movements at off-peak hours+30Is more than 5 minutes
5Services inside the station+31The only service inside the station is a shoe cleaner machine
6Control center+30There is no control center
7Located on the busiest route+22It has the highest demand
8Service times+20It is close at late hours and on holidays
9Multicorridor network+20There is no particular network along the route
10Set the route of movement+74Too many opening sections
11Route separation+73Too many opening sections and the frequent presence of taxis
12Intersection performance+60It does not have the right of way at any intersection
13Location of bus lanes in stations+40Taxis and other vehicles are present
14Minimizing bus emissions+44All buses have passed EURO III standards
15The station contains several intersections+32Mikael, Farhang
16Central station+31Meli Bank and Mosalla
17The quality of the pavement+21Without reinforced concrete at the stations
18The floor level of the bus stop+66All stations are level
19Comfortable and secure stations+31Access to stations is dangerous
20Number of bus doors+32Includes two doors
21Station sliding doors+10There are not at the stations
22Brand names+30There is no brand in this route
23Passengers information+20There is no information
24Public access+33All stations have wheelchair access
25Integration with other modes of transport+31Only taxi has been integrated
26Pedestrian access possibility+31In most stations, pedestrian accesses are not suitable
27Secure bike parking spaces+20There are no bike parking spaces
28Bike path+21A bike path is nearby but does not have any rental bikes
29Integration of the bike path and the bus lane+10There is no integration between these two routes
30Minimum average speed below 13 km/h105At peak hours, it is 11.7 km/h
31Number of passengers in each direction below 1000100There are more than 1000 passengers in each direction
32Not using the right side of the bus lane52In most parts, there are opening sections
33The gap between bus and station50There is no distance between the bus and the station
34Bus stop invasion to the sidewalk31There is in Farhang
35Overcrowding31There is in Meli bank station
36Poor bus and station maintenance30Bus and station maintenance is desirable
37Distance between stations is long30Distance between stations is desirable