Research Article

The Technical and Economic Study of Solar-Wind Hybrid Energy System in Coastal Area of Chittagong, Bangladesh

Table 8

RES only configuration optimization result.

PV
(kW)
EW10kElecSol12Conv.
(kW)
Initial
capital
Operating
cost ($/yr)
Total
NPC
COE
($/kWh)
Ren.
frac.
Capacity
shortage

201112025$179,72512,098$317,5910.2921.000.08
ā€‰ā€‰1413025$183,92513,580$338,6760.3111.000.08