Research Article
The Technical and Economic Study of Solar-Wind Hybrid Energy System in Coastal Area of Chittagong, Bangladesh
Table 8
RES only configuration optimization result.
| | | | | PV (kW) | EW10k | ElecSol12 | Conv. (kW) | Initial capital | Operating cost ($/yr) | Total NPC | COE ($/kWh) | Ren. frac. | Capacity shortage |
| | | | | 20 | 11 | 120 | 25 | $179,725 | 12,098 | $317,591 | 0.292 | 1.00 | 0.08 | ā | | | | ā | 14 | 130 | 25 | $183,925 | 13,580 | $338,676 | 0.311 | 1.00 | 0.08 |
|
|