Research Article

The Technical and Economic Study of Solar-Wind Hybrid Energy System in Coastal Area of Chittagong, Bangladesh

Table 9

Grid-RES configuration optimization result.

PV
(kW)
EW10kElecSol12Conv.
(kW)
Grid
(kW)
Initial
capital
Operating
cost ($/yr)
Total
NPC
COE
($/kWh)
Ren.
frac.

10000$100011,312$129,9090.1130.00
52210000$16,25511,241$144,3510.1260.07
610000$61,1257,615$147,8990.1290.75
562210000$76,2557,882$166,0790.1450.77