The Technical and Economic Study of Solar-Wind Hybrid Energy System in Coastal Area of Chittagong, Bangladesh
Table 9
Grid-RES configuration optimization result.
| | | | | | PV (kW) | EW10k | ElecSol12 | Conv. (kW) | Grid (kW) | Initial capital | Operating cost ($/yr) | Total NPC | COE ($/kWh) | Ren. frac. |
| | | | | | | | | | 10000 | $1000 | 11,312 | $129,909 | 0.113 | 0.00 | | | | | | 5 | | | 22 | 10000 | $16,255 | 11,241 | $144,351 | 0.126 | 0.07 | | | | | | | 6 | | | 10000 | $61,125 | 7,615 | $147,899 | 0.129 | 0.75 | | | | | | 5 | 6 | | 22 | 10000 | $76,255 | 7,882 | $166,079 | 0.145 | 0.77 |
|
|