Techno-Economic Feasibility of Small Scale Hydropower in Ethiopia: The Case of the Kulfo River, in Southern Ethiopia

Table 9

Electrical.

QuantityValueUnits

Excess electricity9kWh/yr
Unmet load0kWh/yr
Capacity shortage0kWh/yr

ComponentProduction (kWh/yr)Fraction (%)

Total16,116,005100

LoadConsumption (kWh/yr)Fraction (%)

AC primary load818,6955
DC primary load00
Grid sales15,298,33095
Total16,117,025100