Technical information for Mutobo hydropower station.

ParametersValues at Mutobo power station

Penstock length (m)223
Hydraulic head H (m)123.30
Designed flow rate 90% (m3s−1)0.932
Installed power capacity (kW)200
Annual energy generation (MWh)1749.8
Actual power potential (ηo = 80%) (kW)196
Turbine typeFrancis
Turbine efficiency (%)65