|
State/centre | Solar PV | Solar thermal |
Tariff (Rs/kWh) | Control period | Tariff (Rs/kWh) | Control period |
|
CERC | Lev-10.39 AD-1.04 After AD-9.35 | FY 2012-2013 | Lev-12.46 AD-1.24 After AD-11.22 | FY 2012-2013 |
|
Andhra Pradesh | 17.91 (without AD) 14.95 (with AD) | 2010-2011 and 2011-2012 | 15.31 (without AD) 12.85 (with AD) | 2010-2011 and 2012-2013 |
|
Bihar | 10.9 (without AD) 09.85 (with AD) | Up to March 31, 2015 commissioning | 13.11 (without AD) 11.87 (with AD) | Up to March 31, 2015 commissioning |
|
Gujarat | For MW scale plants: Jan 2012–March 2013: 10.37 (without AD), 09.28 (with AD), FY 2013-2014: 9.64 (without AD), 8.63 (with AD), FY 2014-2015: 8.97 (without AD), 8.03 (with AD) For kW scale plants Jan 2012–March 2013: 12.44 (without AD), 11.14 (with AD), FY 2013-2014: 11.57 (without AD), 10.36 (with AD), FY 2014-2015: 10.76 (without AD), 9.63 (with AD) | Jan 29, 2012 to March 31, 2015 | 12.91 (without AD) 11.55 (with AD) | Jan 29, 2012 to March 31, 2015 |
|
Haryana | 9.18 (SPV crystalline) 8.90 (SPV thin film) | 3 years (till FY 2013–FY 2015) | 12.17 | 3 years (till FY 2013–FY 2015) |
|
Karnataka | 14.5 (including rooftop and small solar PV plants) | Up to March 31, 2013 commissioning | 11.35 | Up to March 31, 2013 commissioning |
|
Kerala | 15.18 (including incentives) | For projects commissioned before Dec. 31, 2009 | | |
|
Madhya Pradesh | 10.44 (capacity > 2 MW), 10.70 (capacity up to 2 MW) | Aug 2012 to March 2014 | 12.65 | Aug 2012 to March 2014 |
|
Maharashtra | Lev-11.16 (11.66-RT and SSPGP) AD-1.65 (1.65) After AD-9.51 (10.01) | FY 2010–2014 (5 years from the date of commencement) | Lev-13.44 AD-1.97 After AD-11.47 | FY 2010–2014 (5 years from the date of commencement) |
|
Orissa | Lev-17.80 AD-3.03 After AD-14.77 | Plant commissioned in FY (2012-2013) onwards | Lev-14.73 AD-2.41 After AD-12.32 | Plant commissioned in FY (2012-2013) onwards |
|
Punjab | Lev-10.39 AD-1.04 After AD-9.35 | FY 2012–2016 (5 years from the notification of order) | Lev-12.46 AD-1.24 After AD-11.22 | FY 2012–2016 |
|
Rajasthan | 9.63 (plant commissioned by 31st of March 2014) with AD-10.45 9.63 (roof top and SSPG commissioned by 31st March 2014) | | 11.95 (without AD) With AD-10.45 11.95 (small solar thermal power gen commissioned by 31st of March 2015) | FY 2012-2013 |
|
Tamil Nadu | Lev-18.45 AD-4.11 After AD-14.34 | FY 2010-2011 (till 31/05/12) | Lev-15.51 AD-3.35 After AD-12.16 | FY 2010-2011 (till 31/05/12) |
|
Uttarakhand | Lev-17.70 AD-1.65 After AD-16.05 | FY 2009–2012 (3 years from the commencement of these regulations) | Lev-12.95 AD-1.15 After AD-11.80 | FY 2009–2012 (3 years from the commencement of these regulations) |
|
Uttar Pradesh | 15 (commissioned by Dec 2011, not covered under GOI incentive scheme) | FY 2010–2014 (5 years) | 13 (commissioned by Dec 2011, not covered under GOI incentive scheme) | FY 2010–2014 (5 years) |
|
West Bengal | 10 (capacity ranging 100 KW to 2 MW availing GBI) 10 (grid connected plant not eligible for any incentive and commissioned up to 2012-2013) 10 (projects commissioned after FY 2012 till FY 2015) | FY 2013–2017 (5 years) | NA | NA |
|