Journals
Publish with us
Publishing partnerships
About us
Blog
Journal of Structures
Table of Contents
Journal of Structures
/
2013
/
Article
/
Tab 3
/
Research Article
Soil-Structure Interaction Analysis of
Tall Reinforced Concrete Chimney with Piled Raft and Annular Raft under Along-Wind Load
Table 3
Absolute maximum tangential and radial moments and settlement of the raft.
Conventional method
Soil-structure interaction analysis
Soil type
/
= 12.5
/
= 17.5
/
= 22.5
R
PR
R
PR
R
PR
Tangential bending moment (kNm)
28361.6
S1
28607.0
19299.0
16821.0
10914.0
10474.0
8291.1
S2
14554.0
10952.5
7476.7
7090.3
4917.3
5280.2
S3
6079.8
7248.7
3204.8
4584.4
2103.6
3319.0
S4
2625.3
4565.5
1400.7
2716.6
914.8
1812.0
Radial bending moment (kNm)
12572.1
S1
24740.0
19390.5
19510.5
14806.0
16038.5
12126.0
S2
18315.5
14897.5
13135.0
10971.5
10379.7
9013.2
S3
11714.3
11154.5
8120.8
8217.9
6300.8
6689.3
S4
7286.7
8133.0
4801.8
5797.8
3515.1
4534.6
Settlement (mm)
As per IS: 1904–1986 [
35
], permissible settlement is 0.075 m
S1
72.52
40.52
78.15
42.58
82.60
44.29
S2
26.18
16.67
27.48
17.34
28.40
17.87
S3
8.08
6.46
8.36
6.66
8.64
6.84
S4
2.26
2.15
2.35
2.22
2.42
2.30