Thermal Performance and Economic Analysis of 210 MWe Coal-Fired Power Plant
Table 2
Constants for purchased equipment cost estimation [
11].
| Equipments | | |
| Generator | 138300 | 0.6107 | Steam turbine | 633000 | 0.398 | Condensate extraction pumps | 9000 | 0.4425 | Steam boiler | 1340000 | 0.694 | Boiler feed pumps | 35000 | 0.6107 | Condenser | 398000 | 0.333 |
|
|