Research Article

Fast and Near-Optimal Timing-Driven Cell Sizing under Cell Area and Leakage Power Constraints Using a Simplified Discrete Network Flow Algorithm

Table 3

Results of our method and the optimal DP method with Synopsys 90 nm library [20].

Ckt DNFOpt. DP
Delay (ns) % % Run time (secs) Delay (ns) % % Run time (secs)

C432 1.7 8.5 −9.1 10 1.7 11.7 −9.9 92
C499 1.0 12.8 −9.9 15 1.0 13.2 −9.9 144
C880 1.5 10.5 −9.8 17 1.4 14.7 −10.0 148
C1355 1.0 7.0 −8.8 40 1.0 8.1 −9.0 705
C1908 1.6 12.1 −10.0 72 1.5 16.2 −10.0 1024
C2670 1.3 9.4 −10.0 44 1.3 13.1 −10.0 884
C3540 2.2 13.5 −10.0 105 2.1 17.9 −10.0 1650
C5315 1.6 9.9 −9.4 280 1.5 11.8 −9.5 8410
C6288 6.0 14.2 −10.0 312 5.8 18.2 −10.0 25689
C7552 1.7 10.2 −9.8 364 1.7 13.8 −9.8 13204

Average10.9 −9.7 126 13.9 −9.8 5195