Projects | Location | Scale tons/yr | CO2 capture method | Storage/utilization | Status |
|
() CO2-EOR project by Daqing oilfields | Yushulin, Hailaer | — | — | EOR | Operation |
() CO2-EOR project by Jilin oilfield | Songyuan | 0.28 million | Liquefaction of FCC flue gas | EOR | Operation |
(2-1) Second stage of EOR project in Jilin oilfield | Songyuan | Planned for 0.5 million | Precombustion from the separation of natural gas production | EOR | Operation |
() CO2-EOR project by Shengli oilfield | Dongying | 40,000 | Postcombustion | EOR | Operation |
() EOR project by Zhongyuan oilfield | Puyang | 100,000 | Post-combustion | EOR | Operation |
() EOR project by Yanchang oilfield | Yanchang | 400,000 | Coal liquefaction plant | EOR | Operation |
() First stage of Huaneng greengen IGCC in Tianjin | Tianjin | — | Pre-combustion | Planed for EOR | Operation |
() CO2-ECBM by China United Coalbed Methane Ltd. | Jincheng | 40/day | Purchase of CO2 | ECBM | Completed |
() Full chain CCS project by Shenhua Group | Ordos | 100,000 | Coal liquefaction plant | Saline formation | Completed
|
() Pilot project of IGCC clean energy in Lianyungang | Lianyungang | 1000,000 | Pre-combustion | Planed in saline formation | Preparation |
() 35 MWt oxy-fuel combustion in Zhongyan Yingcheng of Hubei | Yingcheng | 100,000 | Oxy-fuel combustion | Sequestration in the salt rock | Preparation |
() CO2 capture and storage pilot project by China Resources Power | Dongguan | 1 million | Pre-/post-combustion from power station and oil refinery | Planed for EOR or saline formation | Prefeasibility study |
() Coal-to-liquids project in Ningxia by Shenhua Group | Ningxia | 2 million | Pre-combustion from the coal-to-liquids process | Undefined | Opportunity study |
() Third stage of Huaneng greengen IGCC in Tianjin | Tianjin | 2 million | Pre-combustion from the power station | Planed for EOR saline formation | Not start |
() Second stage of coal-to-liquids project by Shenhua Group | Ordos | 1 million | Pre-combustion from the coal-to-liquids process | Saline formation | Prefeasibility study |
() CCS project by Sinopec Qilu Petrochemical | Dongying | 0.5 million | Pre-combustion from oil refinery | EOR | Preliminary design |
() CCS project of Shengli power station by Datang Group | Dongying | 1 million | Post-combustion from the power station | EOR | Prefeasibility study |
() CO2 capture and EOR in coal chemical industry by Yangchang Petroleum Co. Ltd. | Yanchang | 5,0000 | Pre-combustion from coal chemical industry | EOR | Operation |
(17-1) Second stage of CO2 capture and storage project by Yanchang Group | Yanchang | 1 million | Pre-combustion from coal chemical industry | EOR | Not start |
() CO2 capture and storage pilot project in Daqing oilfield by Datang Group | Daqing | 1 million | Oxy-fuel combustion from the power station | Planed for EOR + saline formation | Prefeasibility study |
Coal-to-gas project by CNOOC Datong | Datong | 1 million | Pre-combustion from coal-to-gas process | Planed for EOR + saline formation | Prefeasibility study |
Coal-to-gas project by CNOOC Ordos | Ordos | 1 million | Pre-combustion from coal-to-gas process | Planed for EOR + saline formation | Pre-feasibility study |
Coal-to-olefin Ordos project by CPIC and TOTAL | Ordos | 1 million | Pre-combustion from coal-to-olefin process | Planed for EOR + saline formation | Prefeasibility study |
CCUS project by Shanxi international energy group | Shanxi | 2 million | Oxy-fuel combustion from the power station | Undefined | Prefeasibility study |
|
Industrial conversion of the captured CO2, not for underground geological sequestration |
() Pilot project of CO2 sequestration by microalgae of Xin’ao Group | Dalate qi | 320,000 | Flue gas of the coal chemistry factory | Microbe sequestration | Construction |
() SNG project in Qinghua of Xinjiang | Yili in Xinjiang | — | Pre-combustion | Microbe sequestration | Operation |
() Geothermal power station in Gaobeidian of Beijing by Huaneng | Beijing | 3000 | Post-combustion | Food and industry use | Operation |
() Shidongkou project in Shanghai by Huaneng | Shanghai | 120,000 | Post-combustion | Food and industry use | Operation |
() Shuanghuai power plant project | Chongqing | 10,000 | Post-combustion | N/A | Operation |
() CO2 project in Hainan | Dongfang | 2100 | Separation from natural gas | Biodegradable plastics | Operation |
() CO2 project in Jiangsu | Taixing | 8000 | Alcohol factory | Chemical material | Operation |
() CO2 pilot project in Tianjin | Tianjin | 20,000 | Post-combustion | Food | Preparation |
|