Research Article

The Measures of Efficiency of Power Generation Plants in Sylhet of Bangladesh

Table 3

Likelihood ratio test.

Null hypothesisLog-likelihoodTest statisticCritical valueDecision

−75.4993.655.14Reject
−92.5478.3238.30Reject
−67.2310.783.84Reject
−61.767.093.84Reject

Notes: all critical values are at the 5% level of significance. The critical values are obtained from table of Kodde and Palm (1986).