Research Article

The Measures of Efficiency of Power Generation Plants in Sylhet of Bangladesh

Table 5

Maximum-likelihood estimation with time-variant inefficiency model.

VariableTruncated distribution (time-varying)Half-normal distribution (time-varying)
CoefficientStandard errorCoefficientStandard error

Constant−0.892a0.9870.912a0.100
FC0.275b0.8290.294b0.158
FCS0.2870.8560.389b0.188
LOC0.152b0.9820.1370.176
AC0.2090.9200.1880.333
HR0.3490.9280.3290.665
HOR0.7750.978−0.378a0.804
FC2−0.3590.7870.3350.610
FCS2−0.2240.826−0.1120.463
LOC20.1390.9590.151a0.223
AC20.8610.8950.9240.633
HR2−0.2360.925−0.2550.183
HOR20.3370.9790.6080.646
FC × FCS0.825a0.6690.7900.349
FC × LOC−0.2370.775−0.1230.145
FC × AC−0.4700.719−0.4220.127
FC × HR−0.646a0.756−0.655a0.358
FC × HOR−0.3140.790−0.1870.414
FCS × LOC0.719b0.8180.480a0.150
FCS × AC−0.4890.746−0.1190.109
FCS × HR0.5740.7740.1630.385
FCS × HOR−0.3930.815−0.3870.434
LOC × AC0.8140.8490.7830.262
LOC × HR0.3740.9180.5830.381
LOC × HOR0.1490.9470.1480.496
AC × HR0.742b0.8380.7370.310
AC × HOR0.3250.8700.386b0.945
HR × HOR0.3590.9000.3500.147
Sigma0.7720.0560.1080.049
Gamma0.469a0.8370.210a0.313
Mu0.398c0.34200
Eta0.030a0.5780.300a0.214
Log-likelihood75.02568.483
Mean efficiency0.92710.9028

aSignificance at the 1% level, bsignificance at the 5% level, csignificance at the 10% level.