Research Article
Membrane Fouling and Chemical Cleaning in Three Full-Scale Reverse Osmosis Plants Producing Demineralized Water
Figure 2
Key performance parameters NPD (a) and (b) of plant location II. Vertical lines indicate CIP. Horizontal lines indicate performance with new membranes [day zero]. From this installation, a lead element from the first stage was taken (02.11.2010). Time point of membrane autopsy is indicated with dark grey arrow.
(a) |
(b) |