Research Article

Cost-Benefit Analysis for the Concentrated Solar Power in China

Table 1

Design parameters of CSP demonstration plants.

NumberProjectsDNI (kWh/m2/yr)Total investment (million RMB)Annual power generation (GWh/yr)TES capacityTES medium

ST1 [32]Qinghai Delingha 50 MW MS ST-CSP plant1,9761,0501366 hMS
ST2 [33]Dunhuang 100 MW MS ST-CSP plant2,0003,04048311 hMS
ST3 [34]Qinghai Gonghe 50 MW MS ST-CSP plant1,9001,222156.96 hMS
ST4 [35]Xinjiang Hami 50 MW MS ST-CSP plant1,9201,580198.48 hMS
ST5 [32]Delingha 135 MW DSG ST-CSP plant1,9003.7 hMS
ST6 [36]Gansu Jinta 100 MW MS ST-CSP plant1,9002,500323.28 hMS
ST7 [37]Yumen 50 MW MS ST-CSP plant1,8001,7902169 hMS
ST8 [38]Yumen 100 MW MS ST-CSP plant1,8003,00038810 hMS
ST9 [32]Shangyi 50 MW DSG ST-CSP plant1,60012 hMS
PT1 [39]Yumen East Town 50 MW TO PT-CSP plant (Royal tech CSP Co., Ltd.)1,8001,344.77169.39 hMS
PT2 [32]Gansu Akesai 50 MW MS PT-CSP plant2,056.51,98625615 hMS
PT3 [32]Yumen East Town 50 MW TO PT CSP plant (Rayspower Energy Group Co., Ltd.)1,8009 hMS
PT4 [40]Urat Middle Banner 100 MW TO PT-CSP plant2,0252,80035010 hMS
PT5 [32]Delingha 50 MW TO PT-CSP plant1,9761,938.382259 hMS
PT6 [32]Gansu Gulang 100 MW TO PT-CSP plant1,9137 hMS
PT7 [41, 42]Zhangjiakou 64 MW MS PT-CSP plant1,7001,80030016 hMS
LF1 [43]Dacheng Dunhuang 50 MW MS LF-CSP plant2,0001,680201.513 hMS
LF2 [32]Zhangbei 50 MW DSG LF-CSP plant1,75014 hASSC
LF3 [44, 45]Huaqiang Zhaoyang Zhangjiakou 50 MW DSG LF-CSP plant1,7501,80025014 hASSC
LF4 [46]Urat Middle Banner 50 MW TO LF-CSP plant2,0251,476195.888 hMS

Note. MS: molten salt; TO: thermal oil; ASSC: all solid state concrete; DSG: direct steam generation.