Research Article

Effect of Hydrologic Alteration on the Community Succession of Macrophytes at Xiangyang Site, Hanjiang River, China

Table 3

Comparison results of the parameters of EFC in the three periods at Xiangyang site.

ParametersPrePostRelative alteration
Post (all)Post (1974–1990)Post (1991–2013)Post (all)Post (1974–1990)Post (1991–2013)

January low flow3548579717541.420.131.13
February low flow354852931786.31.40.091.22
March low flow5518308837700.510.060.40
April low flow724853936.88530.180.100.18
May low flow82698810408930.20.050.08
June low flow5829491160889.30.630.220.53
July low flow7611130124511250.480.100.48
August low flow7671175127010900.530.080.42
September low flow88710501220947.50.180.160.07
October low flow78579010507190.010.33−0.08
November low flow624764941.5749.50.230.230.20
December low flow422746810.57000.770.090.66

Extreme low peak2622642642520.010−0.04
Extreme low duration112.54.51.75−0.770.80 −0.84
Extreme low timing45.54860220.050.25−0.52
Extreme low counts69414613610−1−0.07−0.99

High flow peak2430153015301520−0.370−0.37
High flow duration533.53−0.40.17−0.40
High flow timing1822012002050.10.000.13
High flow frequency9684−0.330.33−0.56
High flow rise rate758125110145.5−0.83−0.12−0.81
High flow fall rate−408−110−86.14−126.2−0.73−0.22−0.69

Small flood peak197001950019400−0.01−0.01/
Small flood duration2839460.390.18/
Small flood timing2182782780.280.28/
Small flood counts42990−0.78−0.78/
Small flood rise rate1408483032502.43−0.33/
Small flood fall rate−800−532−1165−0.331.19 /

Large flood peak37800///
Large flood duration49///
Large flood timing225.5281///
Large flood counts4000///
Large flood rise rate88144830///
Large flood fall rate−916−532.2///