Research Article
Nuclear Waste Management Decision-Making Support with MCDA
Table 1
SNF-produced and cumulative inventory in storage in 2016, 2020, and 2030 [6].
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Part of 234.9 tHM (before irradiation) transported to reprocessing facility and 1.68 tHM (after irradiation) waiting for dry storage; 1.68 tHM transported to LLW national repository for temporary storage awaiting geological disposal; cumulative in-storage totals include fuel arising from a steam-generating heavy water reactor, the prototype fast breeder reactor, and breeder fuel from the Dounreay fast reactor; including LWR fuel and HWR fuel; tHM/year; tHM cumulative; N/A: not available. |