Research Article
New Active Control Method Based on Using Multiactuators and Sensors Considering Uncertainty of Parameters
Table 3
The actuator and sensor locations for the five-story shear building.
| Degree of freedom | | | Priority of the actuator installation | Priority of the sensor installation |
| 1 | 0.1565 | 0.1922 | 5 | 5 | 2 | 0.2991 | 0.3673 | 4 | 4 | 3 | 0.4541 | 0.5576 | 3 | 2 | 4 | 0.5555 | 0.6821 | 2 | 1 | 5 | 0.6093 | 0.3741 | 1 | 3 |
|
|