Research Article

Analysis, Design, and Construction of a Base-Isolated Multiple Building Structure

Figure 15

Images of the installation works of a DFP isolator placed below the bottom R/C slab of an elevator (left) and some isolators with the top cylindrical caps screwed before casting the relevant upper R/C beam.
585429.fig.0015