Research Article
Case Study of Remaining Service Life Assessment of a Cooling Water Intake Concrete Structure in Indonesia
Table 7
Half-cell potential measurement of rebar.
| Number | | Train A/B | Train C/D | Train E/F | Train G/H | Readings (mV) |
| 1 | | −0.380 | −0.120 | −0.080 | −0.090 | 2 | | −0.330 | −0.130 | −0.090 | −0.070 | 3 | | −0.220 | −0.090 | −0.120 | −0.100 | 4 | | −0.370 | −0.030 | −0.100 | −0.070 | 5 | | −0.180 | −0.120 | −0.110 | −0.080 | 6 | | −0.220 | −0.090 | −0.130 | −0.100 | 7 | | −0.120 | −0.130 | −0.150 | −0.120 | 8 | | −0.130 | −0.280 | −0.130 | −0.060 | 9 | | −0.180 | −0.140 | −0.100 | −0.080 | 10 | | −0.200 | −0.140 | | | 11 | | −0.220 | −0.160 | | | 12 | | −0.150 | −0.120 | | | 13 | | −0.180 | −0.240 | | | 14 | | −0.210 | −0.190 | | | 15 | | −0.140 | −0.180 | | | 16 | | −0.050 | −0.200 | | | 17 | | −0.050 | −0.270 | | | 18 | | −0.050 | −0.320 | | | 19 | | −0.050 | −0.270 | | | 20 | | −0.100 | −0.270 | | | 21 | | | −0.270 | | | 22 | | | −0.340 | | | 23 | | | −0.510 | | | 24 | | | −0.520 | | | 25 | | | −0.520 | | |
| | Minimum | −0.380 | −0.520 | −0.150 | −0.120 |
| | Maximum | −0.050 | −0.030 | −0.080 | −0.060 |
| | Average | −0.177 | −0.226 | −0.112 | −0.086 |
|
|