Research Article

Case Study of Remaining Service Life Assessment of a Cooling Water Intake Concrete Structure in Indonesia

Table 7

Half-cell potential measurement of rebar.

NumberTrain A/BTrain C/DTrain E/FTrain G/H
Readings (mV)

1−0.380−0.120−0.080−0.090
2−0.330−0.130−0.090−0.070
3−0.220−0.090−0.120−0.100
4−0.370−0.030−0.100−0.070
5−0.180−0.120−0.110−0.080
6−0.220−0.090−0.130−0.100
7−0.120−0.130−0.150−0.120
8−0.130−0.280−0.130−0.060
9−0.180−0.140−0.100−0.080
10−0.200−0.140
11−0.220−0.160
12−0.150−0.120
13−0.180−0.240
14−0.210−0.190
15−0.140−0.180
16−0.050−0.200
17−0.050−0.270
18−0.050−0.320
19−0.050−0.270
20−0.100−0.270
21−0.270
22−0.340
23−0.510
24−0.520
25−0.520

Minimum−0.380−0.520−0.150−0.120

Maximum−0.050−0.030−0.080−0.060

Average−0.177−0.226−0.112−0.086