ME analysis results at investigated test sites.

ME results (at 85% reliability)STH 140STH 11STH 23STH 26
Baseline trafficBaseline + permit trafficBaseline trafficBaseline + permit trafficBaseline trafficBaseline + permit trafficBaseline trafficBaseline + permit traffic

Terminal IRI (m/km)1.9411.9521.8491.8521.8881.8901.9641.964
Rutting depth (mm)All layers12.313.111.411.69.099.1911.211.23
HMA only2.772.902.672.694.834.855.945.94
AC fatigue crackingBottom-up (%)13.0%15.4%16.39%16.68%8.72%9.14%20.56%20.58%
Top-down (m/km)262.4297.1435.8450.6310.3317.6661.6665.9