Research Article

A New Mining Scheme for Hanging-Wall Ore-Body during the Transition from Open Pit to Underground Mining: A Numerical Study

Figure 12

Stope layout and the DDA Model. (a) Layout of the stope structure on the A–A′ section. (b) Model geometry and distribution of measurement points. (c) DDA model.
(a)
(b)
(c)