Research Article

Heat Treatment and Ventilation Optimization in a Deep Mine

Table 1

Air volume of underground ventilation shaft in 1118 m pit of Jinqu Gold Mine.

Ventilation tunnelAir volume (m3/s)Air speed (m/s)

1118 m pithead inlat air tunnel22.32.1
Blind shaft entry21.52.4
640 m level main air tunnel21.12.3
640 m level leading to the main return air tunnel18.33.4
440 m inclined shaft airway5.41.2
440 m level return air well5.22.1
440 m level working face0.20.07
280 m inclined shaft airway00
280 m level return air well00
280 m level working face0.10.05