Valuation of Guaranteed Maximum Price Contracts in Korea Using the Collar Option Model
Table 5
Maximum and minimum values of cost.
Range
Maximum value
Minimum value
0.05–99.95% (0.1%)
$62,074,638
$42,934,102
0.5–99.5 (1%)
$57,901,101
$44,945,033
2.5–97.5 (5%)
$55,190,504
$46,359,045
5–95 (10%)
$54,070,058
$46,819,569
7.5–92.5 (15%)
$53,414,426
$47,110,991