Research on Inpit Dumping Height during Tracing Mining Period between Two Adjacent Surface Coal Mines

Table 2

Relationship between the dumping height and the total cost.

Dumping height (m)Transportation cost (million yuan)Secondary stripping cost (million yuan)Total cost (million yuan)

0571.500571.50
15500.272.05502.32
30431.988.22440.20
45367.0318.49385.52
60305.8332.87338.70
75248.7851.36300.14
90196.3173.96270.27
105148.86100.66249.52
120106.83131.48238.31
13570.65166.40237.05
15040.74205.43246.17
16517.53248.57266.10
1800301.59301.59