Research on Inpit Dumping Height during Tracing Mining Period between Two Adjacent Surface Coal Mines

Table 4

Transportation cost of stripping spoil over elevation 1100 in Haerwusu coal mine with elevation 1100 covered.

ElevationEngineering quantity (m3 × 106)Distance (m)Transportation unit price (yuan/m4)Transportation cost (million yuan)

12050.7464550.002511.88
11902.0163600.002532.03
11753.8264450.002561.50
11608.7265200.0025142.19
114516.0865450.0025263.11
113022.9456300.0025322.82
111524.0645200.0025271.82
110029.4139500.0025290.46
Total1395.82