Research Article

Study on Structural Service Performance of Heavy-Haul Railway Tunnel with Voided Base

Table 1

Management value of track geometric irregularity in the UK.

Control conditionsWavelength (m)Versine (mm)

① Ride performance50.0016.00
20.009.00
10.005.00

② Additional dynamic load on the track5.002.50
2.000.60
1.000.30

③ Corrugated wear0.500.10
0.050.005