Research Article

Study on Structural Service Performance of Heavy-Haul Railway Tunnel with Voided Base

Table 6

Peak values of maximum principal stress of the inverted arch (MPa).

CaseCase 1Case 2Case 3Case 4Case 5Case 6Case 7Case 8

Peak values of maximum principal stress1.121.201.331.411.581.651.431.44