Research Article

Improved Thermally Activated Building System Design Method Considering Integration of Air Systems

Figure 12

CAV system loads and TABS load with different operation times: (a) 24 hrs; (b) 12 hrs; (c) 8 hrs.
(a)
(b)
(c)