Research Article

Improved Thermally Activated Building System Design Method Considering Integration of Air Systems

Table 1

Simulation conditions.

ConditionsContent

Building orientationSouth
DistrictSeoul, Korea
Area760 m2 (40 m × 19 m)
Internal heat gainEquipment: 48 W/m2
Permissible range of room temperature22–26°C
TABS operation8, 12, 24 hours of operation
Air system operation9:00–18:00
TABS placementCeiling (slab)