Research Article

Identification of Risk Factors Affecting PPP Waste-to-Energy Incineration Projects in China: A Multiple Case Study

Table 2

Descriptive statistics of the cases.

ProfileCategoryFrequency

LocationEastern China21 (60%)
Central China8 (22.86%)
Western China6 (17.14%)

Operation timeBefore 200610 (28.57%)
2007–201212 (34.29%)
2013–20176 (17.14%)
Not placed in operation7 (20%)

Total investment (CNY 100 million)1–525 (71.43%)
5–106 (17.14%)
≥104 (11.43%)

Design capability (tonnes/day)500–100018 (51.43%)
1000–200015 (42.86%)
2000–30002 (5.71%)

Incineration technologyGrate furnace20 (57.14%)
Fluidised bed13 (37.14%)
Pyrolysis furnace2 (5.71%)

Current statusCancelled5 (14.29%)
In redecision-making processes1 (2.86%)
Under construction1 (2.86%)
Placed in operation26 (74.29%)
Closed before scheduled closure date2 (5.71%)