Optimal Analysis of Tunnel Construction Methods through Cross Passage from Subway Shaft

Table 2

Cross passage support parameters.

ItemMain materials and specificationsStructure size

SupportBig pipe shedΦ1086Length: 10 m; ring spacing: 0.5 m
Leading conduitΦ423.5, length = 2 m and 3.5 m, steel barRing spacing 0.3 m
Vertical clearance: 1.5 m
Grid steel frameC25, C14 steel barVertical clearance: 0.5 m
Mesh reinforcementΦ8 150150 m gridSurrounded by laying, double
Vertical reinforcementC22 steel barRing spacing: 1.0 m, double
ShotcreteC25 early strength concreteThickness: 0.3 m
Secondary liningC35 waterproof reinforced concrete seepage resistance grade p10Thickness: 0.6 m