Framework for Designing Project Delivery and Contract Strategy in Chinese Construction Industry Based on Value-Added Analysis
Table 4
Value-added way analysis matrix.
Transaction elements
Factors
Value-added features
Positive added value
Negative added value
Cost savings through optimization,
Schedule savings,
Transaction cost reduction,
Contract price,
Transaction object
Quantity uncertainty
√
√
√
×
Project size
√
√
√
√
Transaction subject
Contractor’s capability
√
√
×
×
Owner’s requirements
×
√
×
×
Transaction management
Owner’s supervision method
×
×
√
×
Transaction contract
Risk allocation
√
√
×
×
Transaction environment
Market competence
×
×
×
√
Note. “√” means that the corresponding value-added way has close relationship with the factor; “×” means that the value-added way has no close relationship with the factor.