Research Article

Monitoring and Analysis of Ground Settlement Induced by Tunnelling with Slurry Pressure-Balanced Tunnel Boring Machine

Figure 8

Comparison of volume loss between measurement and predictions for down-track tunnel: (a) total volume loss, (b) shield loss, (c) tail loss, and (d) relative magnitude of observed/predicted volume losses.
(a)
(b)
(c)
(d)