Table 3

Estimated volume loss parameters from down-track tunnelling.

ParameterAverageSettlement arrays
1234567891011121314

(mm)−8.1−7.3−6.8−9.1−10−12−8.9−6.7−4.9−6.3−11−9.1−8−5.5−7.4
(%)0.440.320.30.440.460.490.470.350.240.420.430.590.630.470.58
0.520.480.490.50.440.410.50.490.460.670.350.540.630.660.61