Research Article
Development of Future Rule Curves for Multipurpose Reservoir Operation Using Conditional Genetic and Tabu Search Algorithms
Table 7
Situations of water shortage and excess release of the systems using future inflow.
| Situations | Rule curves | Frequency (times/year) | Magnitude (MCM/year) | Duration (year) | Average | Maximum | Average | Maximum |
| Water shortage | RC1 (existing) | 0.140 | 23.200 | 660.000 | 1.167 | 2.000 | RC2 (CGA) | 0.240 | 9.340 | 412.000 | 1.200 | 2.000 | RC4 (CTSA) | 0.340 | 32.860 | 418.000 | 1.417 | 4.000 | RC3 (CGA) | 0.020 | 5.800 | 290.000 | 1.000 | 1.000 | RC5 (CTSA) | 0.340 | 32.860 | 418.000 | 1.417 | 4.000 |
| Excess release | RC1 (existing) | 0.980 | 2,085.463 | 4,711.864 | 24.500 | 27.000 | RC2 (CGA) | 0.980 | 2,056.182 | 4,697.881 | 24.500 | 27.000 | RC4 (CTSA) | 0.980 | 2,085.965 | 4,702.331 | 24.500 | 27.000 | RC3 (CGA) | 0.980 | 2,045.096 | 4,689.417 | 24.500 | 27.000 | RC5 (CTSA) | 0.980 | 2,085.965 | 4,702.331 | 24.500 | 27.000 |
|
|