The results of the pull-out experiment of the interface between bamboo bolt and modified slurry.

SpecimenAnchoring length Lb (mm)Maximum load Fmax (kN)Maximum strain εmax (%)Maximum stress τmax (MPa)Maximum slipasmax (mm)Ultimate slipbsult (mm)

CB-L-800a8003.750.3840.751
CB-L-800b80019.390.1630.64810.8726.17
CB-L-1200a120028.360.5511.2319.8429.72
CB-L-1200b120025.220.4101.65912.3624.05
CB-L-1500a150035.720.4811.69414.5727.33
CB-L-1500b150034.470.501.20316.2723.27
CB-L-2000a200039.820.4491.73723.2353.68
CB-L-2000b200038.440.4671.89229.0059.38
CB-L-3000a300040.500.602.3117.1255.16
CB-L-3000b300038.630.5211.65220.9160.89
CB-d0-25-15a150031.080.3461.30621.9723.71
CB-d0-25-15b150031.540.3931.10217.2423.27
CB-d0-25-20a200023.140.4511.82932.2639.54
CB-d0-25-20b200035.080.2930.97736.5746.47
CB-d0-50-15a150041.030.3861.41812.8334.78
CB-d0-50-15b150033.030.6172.01116.9923.66
CB-d0-50-20a200038.130.4621.45723.0841.74
CB-d0-50-20b200039.330.4851.76624.9838.35
CB-d-75-15a150016.140.3310.7839.9210.16
CB-d-75-15b150014.630.2931.11412.9314.99
CB-d-75-20a200019.110.491.25825.9630.21
CB-d-75-20b200021.090.2590.62429.8128.63
CB-d-110-15a150033.130.3841.49416.3341.11
CB-d-110-15b150035.190.4621.78925.6947.68
CB-d-110-20a200032.810.4411.23331.9960.22
CB-d-110-20b200029.830.5101.62730.7853.78