Research Article

Optimization of Headways and Departure Times in Urban Bus Networks: A Case Study of Çorlu, Turkey

Table 3

Proposed headways and their corresponding maximum load and capacity values.

Route codeHeadway (minutes)Maximum load (no. of passengers)Capacity

0121413500
0214439450
0329217250
0424299300
0519337350
0623276300
0716489490
0826234250
0930194200
102997200
1130108200
123072200